Between July 2022 and September 2023, I built a 3-car garage on my property in White Bird, Idaho.
The person I hired to do the excavation work never showed up, so I decided it was time to get my own machine. I also got a fork lift setup that can replace the front bucket.
July 15, 2022 - After clearing the pad for the garage foundation, I excavated a trench and spliced into an existing power conduit that runs from the house to a external outlet and fed 2 new electrical circuits to the new garage location.
July 17, 2022 - This is the plan for the garage foundation.
August 27, 2022 - Excavated the footings and framed the forms for the concrete pour.
The electrical conduit and circuits have been routed to the center of the future block wall.
August 31 - The footing forms are framed and ready to pour.
September 6, 2022 - Footings are poured.